MACHC CAPACITY BUILDING MANAGEMENT PLAN

 

 

Shaded lines indicate possible new submissions to IHOCBC considered at 7th MACHC Conference in Acapulco, Mexico, Oct 2006.

 

 

Priority/ Status

Sponsor RHC

Countries

Assistance

Response

Cost

Allocation

Benefits

Planning in progress

 

NL will approach Suriname to confirm still required.

MACHC

Dominican Republic, Suriname, Belize, Costa Rica, and Honduras

Technical Visit

IHB visit.

Included in the IHO WP

Covered by IHO budget.

 

Raise awareness at governmental level, and prepare way for Phase 1 Technical Workshop.

a. Complete

 

 

 

 

b. Complete

MACHC

E Caribbean island states

a. Brief CARICOM Meeting of Transport Ministers.

 

 

b. Follow up visits to countries visited in 1998, and visits to other island states.

Funding

Travel and subsistence

 

a. €2k

 

 

 

b. €13k

 

a. €2k

Out-turn €1.7k

 

b. €13k

Out-turn €16.9k.(Total cost was €30.3k)

Phase 1 Capability increase.

 

Complete

MACHC

Nicaragua

 

 

 

Training Course in basic practical surveying

Funding

Conduct of 3 week course (lecturer, materials, travel).

 

€7k

 

€7k

Out-turn €7k

 

 

FIG/IHO Advisory Board support.  Future potential as sub-regional course. Develop prototype generic course which could apply to other RHCs?

 

Complete

(Feedback required)

MACHC

12 regional states

IHB Seminar for NHC Chairmen, to be held in Acapulco (Mexico)

Funding

a.  Lecturers (tbc)

b.  Travel and subsistence for 12 participants

 

 

€20k

 

 

€20k

 

Phase 1 Capability increase.

Planning in progress

MACHC

Antigua, Bahamas, Barbados, Dominica, Grenada, Jamaica, St Kitts, St Lucia, St Vincent, Trinidad, Anguilla, BVI, Cayman Is., Montserrat, TCI

Belize would like to attend.

CPRNW  Training Course

(5 days), 20-22 Mar 07

 

 

 

 

Funding

a. Travel and subsistence for 10 students. 

 

 

 

b. Lecturers to be provided by CPRNW.  Funding may be required.

 

c. Venue: CMI Jamaica.

 

a. T € 2k

    S €10k

(UK to fund students from OTs and will consider Belize)

b. € 3k

 

   € 3.5k

 

   

 

 

€ 18.5k

 

 

 

 

 

 

 

 

 

Early follow up to Technical Visits and identification of national co-ordinators.

Phase 1 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

2007/1

for late  submission to CBC5

MACHC

Belize, Guatemala,

Honduras

Support to GOH Project

a) Availability of further expert pre- and post-survey advice.  Adviser available from USA.

b) Mobile team deployment to be pursued bilaterally with USA.

Funding

a. T&S

 

 

 

 

 

US$8k

 

 

Phase 2 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

+ Protection of MBRS

2007/2

for late  submission to CBC5

May be delivered bilaterally by UK.  UK to confirm by 31 Oct 06.

MACHC

Antigua and Barbuda, Jamaica, St Kitts & Nevis

Advice for development of prioritised national survey plan as recommended in technical visit report.

Funding

Travel and subsistence for 1 week visit to each country by Cat A surveyor with appropriate planning experience.

UK is considering funding and undertaking this assistance in 2007.

 

US$9.3k if not offered by UK.

 

 

 

UK proposes £5.6k T&S total.

 

Phase 2 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

2007/3

for late  submission to CBC5

MACHC

Jamaica

DCSS for Hydrographic Survey Unit, including training package.

 

Advice

Technical advice on selection from Brazil.

Funding

 

 

 

 

€??k

 

Phase 2 Capability increase.

Including build up of capability for a regional mobile survey team.

Risk Reduction

+ Potential to reduce risk in port approaches.

2008/1 for delivery in first half of 2008.

To be developed for  submission to CBC5 in 2007

MACHC

Barbados, Belize, Grenada (?), Guatemala, Honduras, St Vincent & Grenadines (?), Trinidad & Tobago (?), BVI, Cayman Is (?)

One week course at CMI on basic hydrographic techniques to meet IHO standards for port and approaches surveys.

 

Use Nicaragua syllabus?

Could include US NGS component.

 

Funding

a. Travel and subsistence for x students. 

 

b. Lecturers to be provided by MS (Cuba, US) with Jamaican NLA assistance with practical experience.  Funding required.

 

c. Venue costs?

 

€1.2k per student.

 

€1.2k per lecturer if from within region.

 

Phase 2 Capability increase.

Including build up of regional survey team.

Risk Reduction

+ Potential to reduce risk in port approaches.

2008/2

for submission to CBC 5 in 2007 for delivery in 2008

MACHC

Belize

Advice for development of prioritised national survey plan for areas outside GOH project.

Funding

Travel and subsistence for 1 week visit by Cat A surveyor with appropriate assistance.

Adviser available from Venezuela.

 

 

US$ 2.5k

 

Phase 2 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

Subject to acceptance by recipient state.

Candidate item for submission to CBC 5 in 2007 for delivery in 2008

MACHC

Trinidad & Tobago

Advice for development of prioritised national survey plan as recommended in technical visit report.

Funding

Travel and subsistence for 1 week visit by Cat A surveyor with appropriate assistance.

Adviser available from Venezuela.

 

 

US$ 2.5k

 

 

 

 

 

 

Travel on to Grenada.

 

Phase 2 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

Subject to acceptance by recipient state.

Candidate item for submission to CBC 5 in 2007 for delivery in 2008

MACHC

Grenada

Advice for development of prioritised national survey plan as recommended in technical visit report.

Funding

Travel and subsistence for 1 week visit by Cat A surveyor with appropriate assistance.

Adviser available from Venezuela.

 

 

US$ 1.5k

 

Phase 2 Capability increase.

Risk Reduction

+ Potential to reduce risk on international and regional routes and in port approaches.

To be developed with target of submission to CBC6 in 2008

MACHC

Jamaica, Barbados, Grenada (?), Trinidad & Tobago.

Formation of sub-regional mobile survey team:

- initial planning meeting and survey (Basseterre Bay, St Kitts, subject to concurrence of St Kitts & Nevis).

 

Funding

a. Travel and Subsistence

 

b. Transport of equipment.

 

€1.2k per team member.

€?k

 

Phase 2 Capability increase.

Including build up of capability of a regional mobile survey team.

Risk Reduction

+ Potential to reduce risk in port approaches.

Host could offer to cover all costs.

MACHC

UK joint survey with Jamaica in late 07 - early 08 under consideration in MODUK.

Survey field experience through attachment to MS survey unit (Argentina, Colombia, Mexico, UK,?).

 

Funding

Travel and Subsistence

Host MS to specify any daily subsistence costs.

 

T  €?k

S  €?k

 

Phase 2 Capability increase.

Including build up of regional survey team.

Risk Reduction

+ Potential to reduce risk in port approaches.

 

MACHC

 

Increase awareness through attendance of small island representatives at meetings of Cruise Liner industry (e.g. Cartagena 2007).

Funding

a. Travel and Subsistence

 

 

 

Increase awareness

Influence risk analysis in shipping industry

 

MACHC

 

Training at University level for hydrography and cartography (Argentina, US)

Funding

 

 

 

 

 

MACHC

 

Training (Cat A and B) with MS (Argentina, Colombia, France, Mexico, Venezuela, UK, US)

Funding

 

 

 

 

 

MACHC

All MACHC coastal states without such a plan

Advice for development of prioritised national survey plan.

Funding

 

 

 

 

 

MACHC

All MACHC coastal states without such a capability

Basic hydrographic capability for post disaster survey

Funding