Shaded lines indicate possible new
submissions to IHOCBC considered at 7th MACHC Conference in
|
Priority/
Status |
Sponsor
RHC |
Countries |
Assistance |
Response |
Cost |
Allocation |
Benefits |
|
Planning in progress NL will approach |
MACHC |
|
Technical Visit |
IHB visit. |
Included in the
IHO WP Covered by IHO
budget. |
|
Raise awareness at governmental level, and
prepare way for Phase 1 Technical Workshop. |
|
a. Complete b. Complete |
MACHC |
|
a. Brief CARICOM
Meeting of Transport Ministers. b. Follow up
visits to countries visited in 1998, and visits to other island states. |
Funding Travel and subsistence |
a. €2k b. €13k |
a. €2k Out-turn €1.7k b. €13k Out-turn €16.9k.(Total cost was €30.3k) |
Phase 1 Capability
increase. |
|
Complete |
MACHC |
|
Training Course
in basic practical surveying |
Funding Conduct of 3
week course (lecturer, materials, travel). |
€7k |
€7k Out-turn €7k |
FIG/IHO Advisory Board support. Future potential as sub-regional course. Develop prototype generic
course which could apply to other RHCs? |
|
Complete (Feedback
required) |
MACHC |
12 regional states |
IHB Seminar for
NHC Chairmen, to be held in |
Funding a. Lecturers
(tbc) b. Travel and
subsistence for 12 participants |
€20k |
€20k |
Phase 1 Capability
increase. |
|
Planning in
progress |
MACHC |
Antigua,
Bahamas, Barbados, Dominica, Grenada, Jamaica, St Kitts, St Lucia, St
Vincent, Trinidad, Anguilla, BVI, Cayman Is., Montserrat, TCI |
CPRNW Training Course (5 days), 20-22
Mar 07 |
Funding a. Travel and
subsistence for 10 students. b. Lecturers to
be provided by CPRNW. Funding may be
required. c. Venue: CMI |
a. T € 2k S €10k ( b. € 3k € 3.5k |
€ 18.5k |
Early follow up to Technical Visits and
identification of national co-ordinators. Phase 1 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. |
|
2007/1 for late submission to CBC5 |
MACHC |
|
Support to GOH
Project a) Availability
of further expert pre- and post-survey advice. Adviser available from b) Mobile team
deployment to be pursued bilaterally with |
Funding a. T&S |
US$8k |
|
Phase 2 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. + Protection of
MBRS |
|
2007/2 for late submission to CBC5 May be delivered bilaterally by |
MACHC |
|
Advice for
development of prioritised national survey plan as recommended in technical
visit report. |
Funding Travel and
subsistence for 1 week visit to each country by Cat A surveyor with
appropriate planning experience. |
US$9.3k if not
offered by |
|
Phase 2 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. |
|
2007/3 for late
submission to CBC5 |
MACHC |
|
DCSS for
Hydrographic Survey Unit, including training package. |
Advice Technical advice
on selection from Brazil. Funding |
€??k |
|
Phase 2 Capability increase. Including build
up of capability for a regional mobile survey team. Risk Reduction + Potential to
reduce risk in port approaches. |
|
2008/1 for delivery in first half of 2008. To be developed for submission to CBC5 in 2007 |
MACHC |
|
One week course
at CMI on basic hydrographic techniques to meet IHO standards for port and
approaches surveys. Use Could include US NGS component. |
Funding a. Travel and
subsistence for x
students. b. Lecturers to
be provided by MS ( c. Venue costs? |
€1.2k
per student. €1.2k
per lecturer if from within region. |
|
Phase 2 Capability increase. Including build
up of regional survey team. Risk Reduction + Potential to
reduce risk in port approaches. |
|
2008/2 for submission to CBC 5 in 2007 for delivery in 2008 |
MACHC |
|
Advice for
development of prioritised national survey plan for areas outside GOH
project. |
Funding Travel and
subsistence for 1 week visit by Cat A surveyor with appropriate assistance. Adviser
available from |
US$
2.5k |
|
Phase 2 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. |
|
Subject to acceptance by recipient state. Candidate item for submission to CBC 5 in 2007 for
delivery in 2008 |
MACHC |
Trinidad & Tobago |
Advice for
development of prioritised national survey plan as recommended in technical
visit report. |
Funding Travel and
subsistence for 1 week visit by Cat A surveyor with appropriate assistance. Adviser
available from |
US$
2.5k Travel
on to |
|
Phase 2 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. |
|
Subject to acceptance by recipient state. Candidate item for submission to CBC 5 in 2007 for
delivery in 2008 |
MACHC |
|
Advice for
development of prioritised national survey plan as recommended in technical
visit report. |
Funding Travel and
subsistence for 1 week visit by Cat A surveyor with appropriate assistance. Adviser
available from |
US$ 1.5k |
|
Phase 2 Capability increase. Risk Reduction + Potential to
reduce risk on international and regional routes and in port approaches. |
|
To be developed with target of submission to CBC6 in
2008 |
MACHC |
|
Formation of
sub-regional mobile survey team: - initial
planning meeting and survey ( |
Funding a. Travel and
Subsistence b. Transport of
equipment. |
€1.2k
per team member. €?k |
|
Phase 2 Capability increase. Including build
up of capability of a regional mobile survey team. Risk Reduction + Potential to
reduce risk in port approaches. |
|
Host could offer to cover all costs. |
MACHC |
|
Survey field
experience through attachment to MS survey unit ( |
Funding Travel and Subsistence Host
MS to specify any daily subsistence costs. |
T €?k S €?k |
|
Phase 2 Capability increase. Including build
up of regional survey team. Risk Reduction + Potential to
reduce risk in port approaches. |
|
|
MACHC |
|
Increase
awareness through attendance of small island representatives at meetings of
Cruise Liner industry (e.g. Cartagena 2007). |
Funding a. Travel and Subsistence |
|
|
Increase awareness Influence risk analysis in shipping industry |
|
|
MACHC |
|
Training at
University level for hydrography and cartography ( |
Funding |
|
|
|
|
|
MACHC |
|
Training (Cat A
and B) with MS ( |
Funding |
|
|
|
|
|
MACHC |
All MACHC coastal states without such a plan |
Advice for
development of prioritised national survey plan. |
Funding |
|
|
|
|
|
MACHC |
All MACHC coastal states without such a capability |
Basic
hydrographic capability for post disaster survey |
Funding |
|
|
|