Annex "B" |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
“ Spread Sheet for the preparation of the
IHO 5 Years Draft WP 2008/2012”. |
|
|
|
|
|
|
|
|
|
Program 1 |
Co-operation with Member States and with International
Organizations |
|
|
|
|
Concept: |
This
Program refers to the Organization’s desire to improve co-operation among the
IHO Member States through the work of the Regional Hydrographic Commissions,
encouraging bilateral and multi-lateral co-operation among National
Hydrographic Services. It also concerns encouragement of M.S. participation
in IHO organs and bodies, the enlargement of the RHCs and the co-operation
with other international organizations to ensure their cooperation and
collaboration. Main participants are IHO Member States, RHCs, Non IHO Member
States, relevant IGOs and NIGOs, and the IHB. |
|
|
|
|
|
Element 1.1
Co-operation with Member States |
|
|
|
|
|
|
|
Objective: Facilitate IHO MS
coordination, cooperation and
collaboration to improve hydrographic services and the provision of
hydro-cartographic products through the structure of the RHCs. |
|
|
|
|
|
Task 1.1.10 |
Preparation,
attendance and reporting of the MACHC Meeting |
CHAIRMAN |
|
|
|
|
|
|
|
|
|
Element 1.2
Co-operation with International and Regional Organizations |
|
|
|
|
|
Objective:
Improve relationship with relevant international organizations aiming at
facilitating the representation of IHO interests; taking advantage of their
structure and potential capabilities to contribute to facilitate IHO
achievement of its Mission and developing projects of common interest. |
|
COLOMBIA |
|
|
|
|
|
Task 1.2.1 |
IOCARIBE |
|
|
|
|
|
Task 1.2.2 |
COCATRAM |
|
|
|
|
|
Task 1.2.3 |
IMO
- CURTIS ROACH |
|
|
|
|
|
Task 1.2.4 |
CARICOM |
|
|
|
|
|
Task 1.2.5 |
CRUISES
LINERS ORGANIZATION |
|
|
|
|
|
Task 1.2.6 |
UN
REGIONAL CARTOGRAPHIC OF THE AMERICAS |
|
|
|
|
|
Task 1.2.7 |
OFF
SHORE INDUSTRIES |
|
|
|
|
|
Task 1.2.11 |
PAIGH:
participation in the meetings of the Hydrographic Committee of the PAIGH to
encourage countries that are not IHO members to avoid duplication, take
advantage of IHO efforts and to become members of the Organization. |
|
|
|
|
|
infraestructura de datos
espaciales de las americas |
|
|
|
|
Element 1.3
Co-operation with non-Member States |
|
|
|
|
|
|
|
Objective: Raise awareness before the authorities of non-member States of
the importance of hydrography and its related products. Give advice to
maritime countries on how to comply with international regulations such as
SOLAS V and highlight the importance
of coordinated efforts in providing safety to navigation and protection to
the marine environment. Stressing the importance to become IHO Members States
and be integrated to the work of the RHCs. |
|
Note: Only RHCs in developing
areas have been considered in the list of tasks listed below. |
|
|
|
|
Task 1.3.3 |
The
IHB with the support of the members of the MACHC, to develop and execute a
strategy to increase participation of Non-Member States in IHO business, and to encourage them to join the
Organization. |
UK |
|
|
|
|
|
|
|
|
Program 2 "Capacity
Building" |
|
|
|
|
Concept: |
This
Program refers to the Organization’s desire to support Member States as well
as Non Member States to built national hydrographic capacities where do not
exist and to contribute to the improvement of the already established
hydrographic infrastructure. It is a collective IHO effort that includes
mainly the IHO Capacity Building Committee, the IHB, the IHO developed and
developing MSs, RHCs, non-MSs, funding agencies and other international
organizations, together with the private sector and the academia. |
|
|
|
|
|
Element 2.1 Capacity
Building Management |
|
|
|
|
|
Objective: The establishment of
coordination, operational and control procedures directed to achieve
effective and efficient interaction between all parties involved in the IHO
CB effort. The development and maintenance of an IHO Strategy on Capacity
Building. |
|
CHAIR MACHC CBC |
|
|
|
|
Task 2.1.5 |
Develop and
maintain a Capacity Building Strategy |
|
|
|
|
Task 2.1.6 |
Develop,
maintain, execute and control a Capacity Building Work Program |
|
|
|
|
Task 2.1.7 |
Exercise
a follow-up of all CB initiatives, specially those for which the CBFund has
contributed. |
|
|
|
|
|
|
|
|
|
Element 2.2 Capacity
Building Assessment |
|
|
|
|
|
Objective: Assessment of the hydrographic surveying,
nautical charting and nautical information status of nations and regions
where hydrography is developing. Provision of guidelines for the development
of local hydrographic capabilities. Identification of regional requirements
and study of possibilities for capacity building assistance and training from
CBC and other sources. |
|
CHAIR MACHC CBC |
|
|
|
|
Task 2.2.1 |
Establishment
of Action Teams or Technical Visits to the following regions: ( to be
identified) |
|
|
|
|
Task 2.2.2 |
Gathering
and processing information from S-55 Questionnaire world wide. Stress effort
to gather information from the following areas (to be identified) and to keep
the information updated. |
|
|
|
|
Task 2.2.3 |
Establish
and maintain procedures for a continuous assessment from the RHCs Chairmen
and submission of development projects in the area for financial support from
CBC or other sources. |
|
|
|
|
Task 2.2.4 |
Schedule
Technical Visits to assess the status of hydrography, cartography and aids to
navigation to the following areas/countries. (to be determined) |
|
|
|
|
|
|
|
|
|
Element 2.3 Capacity
Building Provision |
|
|
|
|
|
Objective: The scheduling and
execution of initiatives directed to the provision of general support,
training and education to go in support of the identified CB shotcomings.
Identification of aid agencies and other sources of funds.Liaison with Member
States, other organizations and Funding Agencies for such a provision.
Establishment and participation of/in joint development projects. |
|
|
CHAIR MACHC CBC |
|
|
|
|
Task 2.3.1 |
Provide support
to developing countries to raise awareness before their authorities about the
importance of Hydrography (High-level visits from the IHB/M.S
representatives, provision of information material (publication M-2,
brochures etc.) |
|
|
|
|
Task 2.3.2 |
Organization
of Technical workshops and Seminars with a view to providing developing
countries the required basic knowledge about the responsibilities of maritime
countries and how to cope with the problems that they are facing. |
|
|
|
|
Task 2.3.3 |
Encourage
the establishment of Courses in Hydrography and Nautical cartography at
different levels. Considering funding of those courses from the CBC Fund and
other sources. (FIG/IHO/ICA IAB ). |
|
|
|
|
Task 2.3.4 |
Coordinate
training alternative activities such as "on the job training" and
field training using "ships of opportunity". |
|
|
|
|
Task 2.3.5 |
Contribute
to the establishment of new Hydrographic Schools with the support of
FIG/IHO/ICA IAB |
|
|
|
|
Task 2.3.6 |
Co-ordination
and assesment of the hydrographic and cartographic components of multilateral
or bilateral projects such as the following: (to be determined) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Program
3 " Co-ordination, production and
distribution of products and
services". |
|
|
|
|
|
Concept: |
This
Program refers to the Organization’s desire to establish in a coordinated way
a set of methodologies and standards that would facilitate the global
understanding and application of the procedures involved in the principal
technical fields of which IHO is the international competente organization.
It also considers the follow up and requirements needed to support the
provision of this service. It involves mainly, all the technical bodies of
the IHO and the hydrographic industry, private sector and academia. |
|
|
|
|
|
Element 3.1 Meetings of the different Committees and
Working Groups |
|
ECC Technical coordinator |
|
|
|
|
Objective: Facilitate the
interaction between the members of the MACHC and its various Committees and
Working Groups established for a particular purpose in order that
participants may benefit from discussions and agreements achieved at such
meetings. |
|
NOTE: Each task in this section
is intended to be used by each GROUP to identify their meeting schedule. The
lay-down of meetings might be affected if a new structure is approved at the
17th IH Conference. |
|
|
|
|
Task 3.1.1 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.2 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.3 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.4 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.5 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.6 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.7 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
Task 3.1.8 |
Preparation,
attendance and reporting of the …….. Meeting |
|
|
|
|
|
|
|
|
|
Element 3.2 Hydrographic Surveying |
|
|
|
|
|
Objective: to improve top quality hydrographic data
gathering through the development of specifications and standards for the
execution of hydrographic surveys and the provision of support to achieve the
best practice. |
|
|
|
|
|
Task 3.2.4 |
GoH project |
BELICE |
|
|
|
|
|
|
|
|
|
Element 3.3 Nautical
Cartography |
|
MEXICO USA |
|
|
|
|
Objective: to facilitate worldwide top quality charting
coverage through the development of specifications and standards for the
production,distribution and updating of cartographic products and
publications. |
|
|
|
|
|
|
Task 3.3.1 |
Production
distribution and update of ENC |
|
|
|
|
Task 3.3.4 |
Improve chart coverage INT
series |
|
|
|
|
Task
3.3.7 |
|
|
|
|
|
|
|
|
|
|
Element 3.4 Marine
Safety Information |
|
|
|
|
|
Objective: to contribute
towards worldwide top quality safety information in a timely and secure way
through coordinated efforts. |
|
|
USA |
|
|
|
|
Task 3.4.1 |
CPRNW |
|
|
|
|
Task 3.4.2 |
NAVAREA
Coordinators |
|
|
|
|
Task 3.4.3 |
Improve
coverage of GMDSS |
|
|
|
|
Task 3.4.4 |
|
|
|
|
|
|
|
|
|
|
Element
3.5 Data for Geomatics
Application |
|
|
|
|
|
Objective: to
develop standards aiming the provision of standardized services and products
for different applications. |
|
|
COLOMBIA |
|
|
|
|
Task 3.5.3 |
IBCCA Projects |
|
|
|
|
|
|
|
|
|
|
|
|
|
Program
4 " Information Management and Public
Relations". |
|
|
|
|
|
Concept: |
This
Program refers to the Organization’s role to in disseminating relevant
information to MACHC Member States, Organizations and individuals. |
|
|
|
|
|
Element 4.1 Information Management |
|
|
|
|
|
Objective: to maintain MSs well
and timely informed on matters related to the IHO work and objectives. |
|
|
|
|
|
Task 4.1.1 |
Maintenance and
development of the MACHC Web site as the principal means for distribution of
information. Carry out a study about the direct involvement and action of
Committees, Working Groups and Commissions in specific pages of the Site. |
USA |
|
|
|
|
|
|
|
|
|
Element 4.2 Public Relations |
|
|
|
|
|
Objective: Raise awareness of the
importance of hydrography, and ensure that the need for, and responsibilities
of, hydrographic offices are properly understood, particularly in government
and in the user community. |
|
|
|
|
|
Task 4.2.1 |
Keep an active
communication and relationship with the Government of Monaco. |
CHAIR |
|
|
|
|
Task 4.2.2 |
Coordinate
with IHO MSs, non MSs and other relevant international organizations, the
celebration of the Day of Hydrography. |
CHAIR |
|
|
|
|
Task 4.2.3 |
Facilitate
communication between hydrographic industry and MSs. |
CHAIR |
|
|
|
|
Task 4.2.4 |
Produce
a Press Release for widest possible distribution any time an MACHC activity
takes place, at the IHB, nationally or regionally. |
CHAIR |
|
|
|
|
Task 4.2.5 |
Coordinate
delivery of papers at all main events where MACHC is represented. |
CHAIR |
|
|
|
|
|
|
|
|
Program
5 " General Organization
Development". |
|
|
|
|
|
Concept: |
This
Program refers to the maintenance and development of the Organization
structure. It includes both, the IHO and the IHB. Also under this program we
include the IH Conferences. |
|
|
|
|
|
Element 5.1
MACHC Development |
|
|
|
|
|
Objective: To ensure MACHC
development responds to the challenges of the modern word and techniques,
aiming best solution to MSs requirements.
The 2008-2012 Programme 5 will be focused on the implementation of the
decisions taken by the 3rd IEHC and the XVIIth IHC. |
|
|
|
|
|
Task 5.1.1 |
To
develop a process to select the regional representatives to the IHO structure |
MACHC |
|
|
|
|
Task 5.1.2 |
Submite
revision of limits of MACHC due to the incorporation of Brasil |
CHAIR |
|
|
|
|
Task 5.1.3 |
Maintain
and evaluate the MACHC Work Plan |
CHAIR |
|
|
|
|
|
|
|
|
|
Element 5.2 MACHC Administration |
|
|
|
|
|
Objective: To ensure MACHC
development responds to the priorities set by MSs, aiming the provision of
the best service (quality, opportunity, resonable cost) according to the
resources available. |
|
|
|
|
|
Task 5.2.1 |
Review
the Statutes and propose changes needed for a better understanding of its
content. |
MACHC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|